This production meeting was a catch up to see where everyone was:
- The script is in progress - still with producers at the moment, will be passed onto the directors during the study week (19th - 23rd Feb).
- Set design - the details (catwalk / the zoning) will be send to the set design team when they start the unit (6th March).
- Transmission Date - moved to the Thursday 19th April
- Workshops with Del - split into A and B, as for the studio show. Everyone needs to be in all day regardless.
- Everyone must carry on researching into segments
- VT Ideas:
Steals of the Season VT (outfit challenge) - needs more of a challenge, e.g. tighter budget?
Fashion Fails VT (online fails) - more serious / documentary style
- Promo ideas:
Short trailer - steals a shop mannequin and runs down the high street
- Contacts: Susie Bradley ( Usher) - Jo’s Friend - costume buyer
- Research in for meeting Monday, uploaded to google doc in advance
Subscribe to:
Post Comments (Atom)
MAJOR PROJECT: Project Evaluation
Production My aim for this major project unit was to further develop the aspects of production which I had written about in the p...
-
I have already changed the schedule. Alex and I decided that the auditions should be pushed back a week to Week 8. They were originally Week...
-
On Friday, I finished my storytelling script. I never thought I'd get to the end. Today I downloaded a trial of Final Draft so I was abl...
-
The last couple of contextual studies lectures have been very similar but with different types of genre. The first one we looked at was docu...
No comments:
Post a Comment